Roofing renewals

Find all the details on roofing renewals including FAQs, due dates and preparation guidelines.
We aim to replace a pitched roof covering every 60 years, so we wouldn’t consider renewing your roof until it has reached this age.
If there are issues with your roof, we would encourage you to raise these with us as soon as possible.
If repairs are not possible or no longer financially viable, we may consider bringing a roof replacement forward in our programme.
When your roof is due for replacement our investment team will contact you and provide further details on the process.
Typically, a roof renewal will include the following work:
We may also include the following works items if required:
Before we can begin works to the roof at your home, we need to ensure that our contractors are working in a safe environment and that you and your belongings are protected.
Please ensure that:
If you are unable to move items as stated above, please contact us and we can discuss ways in which Westward and our contractors can support you.
If you have any queries relating to preparing for a roof renewal, please contact us using this form.
The following planned works are considered mandatory as they impact on the building and present increased risks if not completed:
· External decorations and repairs
· Roofing replacement works
· Window replacements
· Fire Door replacements
The following works can be refused but only if the condition of the item planned for replacement is satisfactory or if there isn’t a legal/safety compliance requirement:
· External Doors
· Kitchen Replacement
· Bathroom/Wet room replacement
· Heating replacements.
We will try and complete the following works areas on a scheme-wide basis:
· External Decorations
· Pitched roof replacements
· Window replacements
This means we will aim to complete one or more of the above on all Westward homes on that street.
Improvements such as kitchens, bathrooms, heating, external doors and other smaller replacement items are replaced based on the specific age or condition of the improvement and done so on a property-by-property basis.
This means we may not do the above improvements to all homes on a street as a number of the improvements may be varying cycles or in varying condition.
If your home is not on our programme and feel that it should be, please contact us.
We aim to undertake improvements to our homes as per our Westward Standard. If your home isn’t due for replacement due to age, we may still need to complete the improvement due to condition.
If you believe any part of your home requires replacement due to condition you need to report this as a repair. Our repairs team will then review this requirement to understand whether a reasonable repair can take place. If this isn’t a feasible option, it will be referred for early replacement due to condition.
Whether an improvement is chargeable to you, is dependent on your legal agreement with Westward and dependent on the circumstances that the improvement is required.
Home owners/shared owners |
Typically responsible for the management of works in their homes and for paying for these works. |
Leaseholders |
Typically responsible for paying a contribution towards the costs of works. This depends on the details set within their specific lease agreement. |
Tenants |
Westward are responsible for the management and costs relating to improvements. The exception to this is where works are paid for from service charge provisions which are a separate arrangement. |
The contractors undertaking works will be dependent on the location you are in and the works being undertaken.
Area |
Contractor |
North Devon and Bude |
Westward Property Services (WPS) |
South Devon |
Westward Property Services (WPS) or Westcountry Maintenance Services (WMS) |
Cornwall |
Westcountry Maintenance Services (WMS) |
Our contractors will work to minimise disruption as best as possible but planned works can be noisy and messy at times. Our contractors are expected to keep their work area as tidy as possible, but there may be periods where mess is inevitable.
If you are concerned about this, please let us know or discuss with our contractors at their initial survey of your home.
All works that involve entry within your home will require you to be present to allow access.
External works do not need your attendance at all times. If you have a side gate to allow rear access, we urge you to leave this unlocked during any external works. This will allow our contractors to complete their work without delay.
Yes – It is expected that our contractor will lay protective coverings to hallways or rooms that run from the entry point of your home to the bathroom area.
If you have received a letter from Westward regarding a planned improvement at your home, typically this means your home is on our programme for the current financial year which runs from April to the following March. Our contractors are required to complete the entire programme within this time period.
If you haven’t heard from our contractor yet, do not worry. It is likely that your home is planned later in the year. Typically, our contractors will commence communication with you a few months before works would be planned, sometimes sooner.
If you have a specific time of the year that you are unable to have the works completed, please contact us and we may be able to discuss this with our contractor to ensure that this period of the year is avoided.
Similarly, if you believe that your improvement is more urgent, please let us know and we can assess it for prompter action on the programme.
If you are unable to move items stored in your loft, please contact us and/or our contractors so we can offer you some support or to make minor adjustments to assist where possible.
It is important that we upgrade your loft insulation as this is a requirement under the building regulations. The Energy Saving Trust estimate that 25% of a buildings heat loss is through the roof/loft, so loft insulation is incredibly important to keep your home warm and save you money on your heating bills.
Another reason why we need to ensure your loft insulation is up to standard, and more important laid appropriately, is to ensure that condensation formed at ceiling level internally due to lack of or poorly laid insulation is completely avoided.
If you believe that your roof contains asbestos there is no need to worry. Prior to works to any roof, we would need to have completed an appropriate asbestos survey to understand if there are any asbestos containing materials within the roof construction prior to works commencement.
If there is asbestos, our contractors will then follow the Health and Safety Executive’s (HSE) guidance and regulations around its removal depending on the type of the material found.
Any removals will be conducted under controlled conditions using the competently trained contractors as is required under the regulations.
If you have any questions on the removal processes, please let us know and or discuss with our contractors when at your home.
If your chimney is still in use by you, we would need to undertake an assessment of the appliance connected to it to ensure that it is still compliant to the required regulations.
If the appliance and the chimney are compliant, we will retain the chimney. If your chimney is shared with a non-Westward owned property, we will communicate with your neighbour to discuss whether this is still in use.
Where possible, we will always seek to remove a chimney during roof replacement works.
Where possible, we will always seek to remove a chimney during roof replacement works. If your chimney is shared with a non-Westward owned property, we will communicate with your neighbour to discuss whether this is still in use. If the chimney is in use by the non-Westward owned property, we will need to retain the chimney.
Yes, they are allowed to do this and it is vital to ensure the works are completed in a timely manner.
We would expect our contractors to inform you of the location that a skip will be positioned in advance. The position of any skips or materials needs to be done in a way that doesn’t limit access to your home or that creates additional risks.
If you have any concerns about this, please contact us.
Scaffolding is of course a mandatory requirement for all roofing works due to the need to provide contractors with a safe platform to work from.
Our contractors and their scaffolders should design scaffolding so that doors and pathways are not restricted in anyway. Scaffolding should also be designed to ensure windows are still able to be opened.
In rare circumstances, this may be unavoidable. In this instance, our contractor will inform you and seek to have the scaffolding up for the minimum amount of time possible to limit the impact on you.
Typically, we will look to include flat roofs at high level during the pitched roof replacement if of age and in poor condition. If we have needed to replace a flat roof in the past individually, then we wouldn’t replace the flat roof.
Flat roofs on outbuildings or ground floor structures may not be included if the age and condition of the flat roof is deemed to be appropriate.